{"id":906,"date":"2021-01-27T09:18:21","date_gmt":"2021-01-27T16:18:21","guid":{"rendered":"https:\/\/lamesawatercoop.org\/LMWC\/?page_id=906"},"modified":"2021-08-16T11:49:18","modified_gmt":"2021-08-16T17:49:18","slug":"application-to-nmed-dwb","status":"publish","type":"page","link":"https:\/\/lamesawatercoop.org\/LMWC\/well-3\/well-3-arsenic-treatment-project\/application-to-nmed-dwb\/","title":{"rendered":"Application to NMED DWB"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The following material was submitted to the <a rel=\"noreferrer noopener\" href=\"https:\/\/www.env.nm.gov\/\" target=\"_blank\">New Mexico Environment Department (NMED)<\/a> <a rel=\"noreferrer noopener\" href=\"https:\/\/www.env.nm.gov\/drinking_water\/\" target=\"_blank\">Drinking Water Bureau (DWB)<\/a> on January 26, 2021.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><a rel=\"noreferrer noopener\" href=\"http:\/\/lamesawatercoop.org\/LMWC\/Well_3\/Arsenic_Treatment_Facility\/NMED_Application\/ConstructionApplicationFinal060316_210109_LMWC_signed.pdf\" target=\"_blank\">Application for Construction or Modification of a Public Water Supply System<\/a> (3 pages, 1\/26\/2021)<\/li><li><a rel=\"noreferrer noopener\" href=\"http:\/\/lamesawatercoop.org\/LMWC\/Well_3\/Arsenic_Treatment_Facility\/NMED_Application\/ConstructionApplicationChecklist-RevPN100417.pdf\" target=\"_blank\">Application Checklist<\/a> (1 page, 1\/26\/2021)<\/li><li><a rel=\"noreferrer noopener\" href=\"https:\/\/lamesawatercoop.org\/LMWC\/Well_3\/Arsenic_Treatment_Facility\/Plans_2021_01_07\/166204_PlanSet_100pcnt-Signed_200107.pdf\" target=\"_blank\">Plans<\/a> (73 11&#8243; x 17&#8243; pages, 24,475 KB, 1\/7\/2021)<\/li><li><a rel=\"noreferrer noopener\" href=\"http:\/\/lamesawatercoop.org\/LMWC\/Well_3\/Arsenic_Treatment_Facility\/Plans_2021_01_07\/Technical_Specifications-SEALED.pdf\" target=\"_blank\">Specifications<\/a> (322 8.5&#8243; x 11&#8243; pages, 6,053 KB, 1\/7\/2021)<\/li><li><a href=\"http:\/\/lamesawatercoop.org\/LMWC\/Well_3\/Arsenic_Treatment_Facility\/NMED_Application\/LMWC_Well_3_treatment_Engineering_Summary.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Engineering design summary<\/a>, with material supporting adsorption treatment (95 8.5&#8243; x 11&#8243; pages, 7,959 KB, 10\/1\/2020)<\/li><li><a href=\"http:\/\/lamesawatercoop.org\/LMWC\/Well_3\/Arsenic_Treatment_Facility\/NMED_Application\/LMWC_Well_3_treatment_Disinfection_Plan.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">Disinfection plan<\/a> (2 pages, 1\/12\/2021)<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">On 2\/10\/2021, Patrick Castillo at the NMED DWB sent Wilson &amp; co. the following questions:<br><a rel=\"noreferrer noopener\" href=\"http:\/\/lamesawatercoop.org\/LMWC\/Well_3\/Arsenic_Treatment_Facility\/NMED_Application\/La Mesa Well 3-Arsenic Treatment Request for Further.pdf\" target=\"_blank\">Engineering Review Comments<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On 3\/1\/2021, Brian Ambrogi, Wilson &amp; Company sent NMED his <a rel=\"noreferrer noopener\" href=\"http:\/\/lamesawatercoop.org\/LMWC\/Well_3\/Arsenic_Treatment_Facility\/NMED_Application\/NMED Response ltr 210301.pdf\" target=\"_blank\">response to comments<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On 3\/2\/2021, the NMED DWB approved the application, issuing this <a rel=\"noreferrer noopener\" href=\"http:\/\/lamesawatercoop.org\/LMWC\/Well_3\/Arsenic_Treatment_Facility\/NMED_Application\/La Mesa Water Cooperative, NM3500123_Certificate of Project.pdf\" target=\"_blank\">Certificate of Project Approval<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The following material was submitted to the New Mexico Environment Department (NMED) Drinking Water Bureau (DWB) on January 26, 2021. Application for Construction or Modification of a Public Water Supply System (3 pages, 1\/26\/2021) Application Checklist (1 page, 1\/26\/2021) Plans &hellip; <a href=\"https:\/\/lamesawatercoop.org\/LMWC\/well-3\/well-3-arsenic-treatment-project\/application-to-nmed-dwb\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":165,"menu_order":800,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-906","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/lamesawatercoop.org\/LMWC\/wp-json\/wp\/v2\/pages\/906","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lamesawatercoop.org\/LMWC\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lamesawatercoop.org\/LMWC\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lamesawatercoop.org\/LMWC\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lamesawatercoop.org\/LMWC\/wp-json\/wp\/v2\/comments?post=906"}],"version-history":[{"count":5,"href":"https:\/\/lamesawatercoop.org\/LMWC\/wp-json\/wp\/v2\/pages\/906\/revisions"}],"predecessor-version":[{"id":974,"href":"https:\/\/lamesawatercoop.org\/LMWC\/wp-json\/wp\/v2\/pages\/906\/revisions\/974"}],"up":[{"embeddable":true,"href":"https:\/\/lamesawatercoop.org\/LMWC\/wp-json\/wp\/v2\/pages\/165"}],"wp:attachment":[{"href":"https:\/\/lamesawatercoop.org\/LMWC\/wp-json\/wp\/v2\/media?parent=906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}